APPROACH

Proof before
scale.

We treat evidence as an engineering deliverable: the question, comparison, inputs and stage of validation matter as much as the number itself.

THE VALIDATION CHAIN

Four gates. No shortcuts.

A consistent approach across research, predictive software and customer-facing products.

01 / BENCHMARK

Set the baseline

Specify population, horizon, ground truth, reference, and success criteria before evaluation.

02 / FREEZE

Record the run

Version models, inputs, preprocessing, calibration and outputs to guard against post-hoc changes.

03 / REPLAY

Audit the result

Keep sufficient artifacts and methods to reproduce the reported result under controlled access.

04 / DEPLOY

Qualify operation

Test supplier rights, delivery conditions and customer utility before broad deployment claims.

EVIDENCE STAGES

Validation is
not one checkbox.

THOR Flights currently reports predictive performance at P2; BOUNDA and THOR Space follow their own validation paths. Later stages address whether that translates into the intended operational system and into customer value.

P2 · PREDICTIVE EVIDENCE

Defined forward cohort and comparator; this is the current THOR Flights evidence level.

P3 · OPERATIONAL UTILITY

Test whether outputs support actual workflows under controlled customer conditions.

P4 · ECONOMIC VALUE

Measure customer value against an agreed baseline before stating commercial outcomes.

RESPONSIBLE DATA USE

Data rights are
production gates.

THOR 42 LAB intends to process third-party feeds only within appropriate contractual permissions. The intended product architecture generates proprietary THOR outputs rather than acting as an unrestricted raw-data redistribution service.

Commercial rights, provider performance, retention, confidentiality and security arrangements must be checked for each deployment. This website is not a claim of any certification.
01
Rights & permission

Contractual scope determines which data may be processed, retained or used commercially.

02
Provider qualification

Coverage, freshness, quality, cost and resilience are evaluated rather than assumed.

03
Evidence & traceability

Outputs should be linked to input and model versions for meaningful review.

04
Controlled scope

Operational and legal responsibilities are defined before customer rollout.

COLLABORATE

Evaluate against your reality.

Discuss a focused validation, supplier relationship or research collaboration.